elegantthemes.com/

2 Jul 2026 7:00 PM Falkenstein

78/100

Good
Compare
Share & export

Guest scans are always publicly visible.

Export

Export JSON

Get notified when this page gets slower

Register for free – monitoring, alerts and more.

Start for free now →

How the page loads

FCP · 404 ms
404 ms FCP
LCP · 1.3 s
1.3 s LCP
1.4 s
1.4 s
2.6 s
2.6 s
Finished · 3.7 s
3.7 s Finished
View screenshot
Screenshot https://elegantthemes.com/

Overview

Assessment

Die Website ist grundsätzlich solide. Einige klare Bremsen sollten behoben werden. Vor allem die Ladegeschwindigkeit bietet Verbesserungspotenzial.

Speed
56 Critical
Images
88 Good
Caching
100 Excellent
WordPress
100 Excellent
Technical
100 Excellent

Google PageSpeed · Mobile 68 · Desktop 96

Browser runtime measurement

These values come from the real page build in the browser and show the differences between desktop and mobile.

Metric Desktop (1440 px) Mobile (390 px)
Requests 52 47
FCP i 404 ms 604 ms
LCP i 1344 ms 604 ms
CLS i 0.088 0.09
TBT i 1468 ms 15 long tasks 941 ms 10 long tasks

Google PageSpeed score

Synthetic measurement from Google Lighthouse — measured independently of the turbometrics score.

Mobile
68
Google PSI
Desktop
96
Google PSI

Google sees optimisation potential for this page. · Fetched on 2 Jul 2026 7:00 PM

Act now5

Critical

TBT hoch

Total Blocking Time ca. 941 ms

Ein Runtime-Request ist sehr groß

d5-builder.mp4 – 2.52 MB

File: d5-builder.mp4 · Host: www.elegantthemes.com

https://www.elegantthemes.com/images/divi-5/d5-builder.mp4

Viele Bilder

29 Bildquellen

Viele blockierende Scripts

14 Scripts ohne async/defer

Viele Bilder auf der Seite erkannt

Im HTML und in CSS wurden zusammen 29 Bildreferenzen erkannt.

Recommendation: Bilder optimieren, lazy loading nutzen und unnötige Medien reduzieren.

▼ Show 5 images ▲ Hide 5 images
  • · IMAGE perspective-d5.webp www.elegantthemes.com 208,9 KB ↗
  • · IMAGE d5-builder-poster.jpg www.elegantthemes.com 104,3 KB ↗
  • · IMAGE website-category-smb-2x.webp www.elegantthemes.com 67,5 KB ↗
  • · IMAGE website-category-event-2x.webp www.elegantthemes.com 59,8 KB ↗
  • · IMAGE website-category-ngo-2x.webp www.elegantthemes.com 49,6 KB ↗

Real user data (CrUX)

Based on anonymous Chrome user data from the last 28 days · Chrome users only · No Firefox/Safari

LCP i
1.544 ms
INP i
156 ms
CLS i
0,09
TTFB i
1.009 ms

Likely LCP candidate

Mobile · Element

The largest visible content was detected as a likely LCP candidate.

Element type
VIDEO
Host
www.elegantthemes.com
Size
2.582,4 KB
Element size
309 × 173 px
Show technical details
Class: w-full h-auto leading-0

Main causes

Actually loaded in the browser.

Most notable external host
fonts.gstatic.com
471,8 KB · 3 req.
Largest JavaScript asset
jquery.js
29,0 KB · www.elegantthemes.com
Largest image asset
perspective-d5.webp
208,9 KB · www.elegantthemes.com
Most notable third-party category
Fonts
3 req. · 471,8 KB
Mobile vs. desktop: LCP -740 ms Requests -5

Top hosts by data volume

www.elegantthemes.com 3.086,5 KB · 33 req.
fonts.gstatic.com 471,8 KB · 3 req.
widget.trustpilot.com 55,6 KB · 6 req.

Largest requests

VIDEO d5-builder.mp4 www.elegantthemes.com 2.582,4 KB
IMAGE perspective-d5.webp www.elegantthemes.com 208,9 KB
FONT UcCO3FwrK3iLTeHuS_nVMrMxCp50SjIw2boKoduKmMEVuFuYMZg.ttf fonts.gstatic.com 159,2 KB
Resource breakdown – Mobile
JS
82,4 KB (2%)
CSS
703,7 KB (20%)
Images
23,1 KB (1%)
Fonts
0,0 KB (0%)
Video
2.686,7 KB (77%)

Total: 3.503,0 KB

Resource breakdown – Desktop
JS
82,7 KB (2%)
CSS
748,6 KB (21%)
Images
23,1 KB (1%)
Fonts
0,0 KB (0%)
Video
2.686,7 KB (76%)

Total: 3.548,2 KB

Recommendations

Important

JavaScript straffen

Unnötige Skripte, Tracking und Frontend-Last durch Plugins sollten reduziert, verzögert geladen oder nur bei Bedarf eingebunden werden.

Externe Dienste straffen

Mehrere externe Hosts werden beim echten Seitenaufbau geladen. Das erhöht Abhängigkeiten, Verbindungsaufwand und bremst häufig den Seitenaufbau.

CSS und Fonts straffen

Zusätzliche CSS-Abhängigkeiten und viele Webfonts sollten zusammengefasst oder reduziert werden.

Ein externer Host fällt auf

fonts.gstatic.com verursacht rund 471.8 KB bei 3 Requests.

Recommendation: Drittanbieter-Last reduzieren, bündeln oder später laden.

Hauptthread ist spürbar blockiert

Der Browser-Hauptthread war beim Seitenaufbau rund 941 ms blockiert (Total Blocking Time).

Recommendation: JavaScript-Last reduzieren, schwere Skripte verzögert laden und Long Tasks aufteilen.

14 Scripts ohne async/defer

14 JavaScript-Dateien werden synchron geladen und blockieren den Seitenaufbau.

Recommendation: Scripts mit async oder defer Attribut laden wo möglich.

Ein externer Host fällt stark auf

fonts.gstatic.com – 471.8 KB bei 3 Requests

Host: fonts.gstatic.com

Ein externer Host fällt auf

fonts.gstatic.com – 471.8 KB bei 3 Requests

Host: fonts.gstatic.com

Explained simply

These short texts put the most important measurements into plain language.

Serverantwort (TTFB)

Good

Der Server antwortet schnell.

Why it matters: TTFB steht für “Time to First Byte”. Gemeint ist die Zeit bis der Server die ersten Daten zurückliefert.

Technical value: 53 ms

Komprimierung

Good

Die Seite wird komprimiert ausgeliefert. Dadurch müssen weniger Daten übertragen werden.

Why it matters: Komprimierung reduziert die Größe von HTML, CSS und JavaScript bei der Übertragung.

Technical value: Content-Encoding: br (Brotli)

Browser-Caching

Good

Der Browser darf Dateien zwischenspeichern. Wiederholte Seitenaufrufe können dadurch schneller werden.

Why it matters: Browser-Caching verhindert, dass unveränderte Dateien immer wieder neu geladen werden müssen.

Technical value: HTML: public, max-age=259200, CSS: Gut cachebar, JS: Gut cachebar, Bilder: Gut cachebar, Fonts: unbekannt

Bilder

Watch

Es wurden 29 Bildquellen erkannt. Davon nutzen 40 Lazy Loading und 1 moderne Formate wie WebP oder AVIF.

Why it matters: Bilder sind oft der größte Performance-Faktor. Lazy Loading und moderne Formate helfen besonders stark.

Technical value: JPG: 13, SVG: 1, WEBP: 1, gemessenes Bildgewicht: 962.9 KB

JavaScript

Watch

Im direkt ausgelieferten HTML wurden 20 externe JavaScript-Dateien erkannt. Weitere Skripte können erst beim echten Seitenaufbau durch Optimierungs- oder Lazy-Load-Mechanismen geladen werden.

Why it matters: Viele oder große JavaScript-Dateien können den Aufbau und die Interaktivität einer Seite verzögern.

Technical value: 20 externe Dateien, 0 Data-URI-Skripte, 254.8 KB

Fonts

Good

Es wurden keine klaren Webfont-Dateien erkannt.

Why it matters: Viele oder große Webfonts erhöhen die Ladezeit und können sichtbare Layout-Verzögerungen verursachen.

Technical value: 0 Font-Dateien, 0 Externe Font-Dienste, Gruppen: keine gruppierten Fonts erkannt, gemessenes Font-Gewicht: 0 B

CSS

Good

Es wurden 3 direkte CSS-Dateien und 3 zusätzliche CSS-Abhängigkeiten erkannt.

Why it matters: Viele Stylesheets oder importierte CSS-Dateien erhöhen die Anzahl der geladenen Ressourcen.

Technical value: Direkte CSS-Dateien: 3, zusätzliche Abhängigkeiten: 3, geschätztes CSS-Gewicht: 26.0 KB

Externe Dienste

Good

Die Seite lädt Inhalte von 3 externen Hosts.

Why it matters: Jede zusätzliche externe Domain erhöht Abhängigkeiten und kann die Ladezeit beeinflussen.

Technical value: reviews: 1, tag-manager: 1 — widget.trustpilot.com, www.googletagmanager.com, static.cloudflareinsights.com

Sichtbarer Seitenaufbau

Good

Die ersten sichtbaren Inhalte erscheinen nach rund 604 ms, der wichtigste sichtbare Inhalt nach rund 604 ms. Das ist ein guter Wert.

Why it matters: Diese Werte beschreiben, wann Nutzer erste und wichtigste Inhalte tatsächlich sehen.

Technical value: FCP: 604 ms, LCP: 604 ms

Layout-Stabilität

Good

Die Layout-Stabilität ist gut. Der gemessene CLS-Wert liegt bei 0.09.

Why it matters: CLS beschreibt, ob sich Inhalte beim Laden sichtbar verschieben.

Technical value: CLS: 0.09

Echte Browser-Requests

Watch

Beim echten Seitenaufbau werden relativ viele Requests geladen. Gemessen wurden 47 Requests mit rund 3.53 MB.

Why it matters: Dieser Wert zeigt die tatsächliche Laufzeit-Last im Browser und nicht nur statische HTML-Hinweise.

Technical value: 47 Requests, 3.53 MB

Deductions by category

Speed

−5 pts.
Mehrere externe JS-Dateien
20 im HTML erkannt
−20 pts.
TBT hoch
Total Blocking Time ca. 941 ms
−5 pts.
Runtime-Gewicht erhöht
3.53 MB
−4 pts.
Mehrere externe Runtime-Hosts
7 externe Hosts im Browser
−10 pts.
Viele blockierende Scripts
14 Scripts ohne async/defer

Cache quality by asset type

CSS
Well cacheable
3/3 cacheable
JavaScript
Well cacheable
14/15 cacheable
Images
Well cacheable
15/15 cacheable
Fonts
Unknown
0/0 cacheable

Impact of third-party services

Reviews

Impact: mittel

1 assets detected

widget.trustpilot.com

Externe Dienste erhöhen generell Abhängigkeiten und zusätzliche Verbindungen.

Tag manager

Impact: mittel bis hoch

1 assets detected

www.googletagmanager.com

Tag-Manager laden oft weitere Skripte und erhöhen die Abhängigkeit von Drittanbietern.

Externally loaded services in the browser

These services were actually contacted during the real page build in the browser.

Fonts

3 requests · 471,8 KB

fonts.gstatic.com

Reviews

6 requests · 55,6 KB

widget.trustpilot.com

Analytics

2 requests · 0,0 KB

static.cloudflareinsights.com, region1.google-analytics.com

More data

Statically detected external hosts3

These hosts were detected directly in HTML or CSS. Not every one of them was necessarily loaded during the real page build.

  • widget.trustpilot.com
  • www.googletagmanager.com
  • static.cloudflareinsights.com
Statically detected third-party services by category2

This classification is based on statically detected asset hosts and complements the real browser runtime measurement.

Reviews

1 assets detected

widget.trustpilot.com

Tag manager

1 assets detected

www.googletagmanager.com

Largest requests during the real page build10

Technical metrics

HTTP status
200
TTFB
53 ms
HTTPS
Yes
HTTP/2
Yes
HTTP/3
No
Compression
BR (Brotli)
Browser caching
Yes
IPv4
104.16.92.42
IPv6
2606:4700::6810:5b2a
Runtime requests
47
Checked assets
33
Final URL
https://www.elegantthemes.com/

Measurement conditions

IP protocol
IPv4
Latency to site
20 ms
Reference latency
7 ms
Measured at
2 Jul 2026 7:00 PM

Connection timing (TTFB: 53 ms)

DNS 13 ms
TLS 11 ms
Backend 29 ms
Transfer 5 ms
Total / 58 ms
Response, caching and delivery
Redirects
1
Content type
text/html; charset=UTF-8
Page cache
Yes
CDN
Yes
Cache-Control
public, max-age=259200
Origin server
No data
HTML and page structure
HTML size
252,1 KB
DOM elements
1.163
JS files
20
Inline scripts
4
Images total
26
Lazy loading
40
WebP/AVIF
1 of 29 image files
Font files
0
External hosts
3
Scripts without async/defer
13
Images without dimensions
1
Iframes
0
Blocking scripts (5)
  • JS jquery.js www.elegantthemes.com ↗
  • JS cookie.js www.elegantthemes.com ↗
  • JS cookie-consent.js www.elegantthemes.com ↗
  • JS intersectional-observer.js www.elegantthemes.com ↗
  • JS yall.js www.elegantthemes.com ↗
Assets and weight
Images 962,9 KB
JS 254,8 KB
CSS dep 26,0 KB
CSS 5,5 KB
Fonts 0,0 KB
Total weight
1.223,2 KB
Largest image
208,9 KB
Assets with query string
17
Uncacheable assets
1
CSS and external script sources
CSS dependencies
3
CSS dependency weight
26,0 KB
Fonts from CSS
0
Images from CSS
3
External hosts from CSS
0
External script hosts
2
Page build timing
Long tasks

Tasks that blocked the browser main thread.

  • 253 ms→198 ms blocked|js · www.googletagmanager.com
  • 618 ms→23 ms blocked|js · www.googletagmanager.com
  • 711 ms→29 ms blocked|js · www.googletagmanager.com
  • 1.086 ms→12 ms blocked|vermutlich Script-/Rendering-Arbeit
  • 1.197 ms→273 ms blocked|vermutlich Script-/Rendering-Arbeit
  • 1.596 ms→63 ms blocked|hrpt54hy · widget.intercom.io
  • 1.762 ms→193 ms blocked|hrpt54hy · widget.intercom.io
  • 2.006 ms→24 ms blocked|hrpt54hy · widget.intercom.io
  • 2.171 ms→71 ms blocked|vermutlich Script-/Rendering-Arbeit
  • 2.295 ms→55 ms blocked|vermutlich Script-/Rendering-Arbeit

Details on individual metrics

In-depth values for assets, images, fonts, CSS and JavaScript. The most important groups are grouped thematically below.

Largest assets by file size (5)

This list shows the largest measured files from the asset check.

  • JS gtag/js www.googletagmanager.com 178,1 KB ↗
  • IMAGE divi-ui-drag-and-drop.jpg www.elegantthemes.com 82,4 KB ↗
  • IMAGE website-category-smb.jpg www.elegantthemes.com 58,2 KB ↗
  • IMAGE website-category-ngo.jpg www.elegantthemes.com 56,8 KB ↗
  • IMAGE website-category-event.jpg www.elegantthemes.com 55,8 KB ↗
Images in detail
Largest images (5)
  • IMAGE perspective-d5.webp www.elegantthemes.com 208,9 KB ↗
  • IMAGE d5-builder-poster.jpg www.elegantthemes.com 104,3 KB ↗
  • IMAGE website-category-smb-2x.webp www.elegantthemes.com 67,5 KB ↗
  • IMAGE website-category-event-2x.webp www.elegantthemes.com 59,8 KB ↗
  • IMAGE website-category-ngo-2x.webp www.elegantthemes.com 49,6 KB ↗
Lazy-loaded images (40)

This number shows detected hints in the HTML. It is not perfect proof that all images actually use lazy loading. No mapping of individual images is available for this scan – the list therefore shows all images on the page, not only those loaded via lazy loading.

  • IMGlogo-light.svg↗
  • IMGplaceholder.webp↗
  • IMGplaceholder.jpg↗
  • IMGdivi-ui-drag-and-drop.jpg↗
  • IMGquick-sites.jpg↗
Show 15 more images
  • IMGsite-management.jpg↗
  • IMGwebsite-category-cv.jpg↗
  • IMGwebsite-category-ecommerce.jpg↗
  • IMGwebsite-category-smb.jpg↗
  • IMGwebsite-category-coaching.jpg↗
  • IMGwebsite-category-maker.jpg↗
  • IMGwebsite-category-ngo.jpg↗
  • IMGwebsite-category-restaurant.jpg↗
  • IMGwebsite-category-event.jpg↗
  • IMGwebsite-category-health.jpg↗
  • IMGwebsite-category-product.jpg↗
  • IMGwebsite-category-services.jpg↗
  • IMGwebsite-category-fashion.jpg↗
  • IMGjosh-hall.jpg↗
  • IMGtim-strifler.jpg↗

Only the first 20 entries are shown.

Images from CSS (3)

These are image files that are not referenced directly in the HTML, but in CSS via url(...) references.

  • IMG perspective-d5.png www.elegantthemes.com ↗
  • IMG perspective-d5.webp www.elegantthemes.com ↗
  • IMG promo-bg-workspaces.png www.elegantthemes.com ↗
Image types (3)
  • JPG 13 files 565,8 KB
  • SVG 1 files 8,3 KB
  • WEBP 1 files 4,1 KB
Fonts and CSS in detail
Additional CSS dependencies (3)

These are stylesheets referenced within other CSS files via @import references.

  • CSS styles-deferred-new.css www.elegantthemes.com ↗
  • CSS home.css www.elegantthemes.com ↗
  • CSS promo-d5-feature.css www.elegantthemes.com ↗
Detected JavaScript files (20)

These are the external script sources detected in the directly delivered HTML. Dynamically loaded scripts are not fully included.

  • JS tp.widget.bootstrap.min.js widget.trustpilot.com ↗
  • JS jquery.js www.elegantthemes.com ↗
  • JS cookie.js www.elegantthemes.com ↗
  • JS cookie-consent.js www.elegantthemes.com ↗
  • JS intersectional-observer.js www.elegantthemes.com ↗
  • JS yall.js www.elegantthemes.com ↗
  • JS magnificpopup.js www.elegantthemes.com ↗
  • JS relax.js www.elegantthemes.com ↗
  • JS jquery.plugin.min.js www.elegantthemes.com ↗
  • JS jquery.countdown.min.js www.elegantthemes.com ↗
  • JS allpages-new.js www.elegantthemes.com ↗
  • JS testimonial-slider.js www.elegantthemes.com ↗
  • JS promo.js www.elegantthemes.com ↗
  • JS promo-d5-feature.js www.elegantthemes.com ↗
  • JS gtag/js www.googletagmanager.com ↗
  • JS alpine.min.js www.elegantthemes.com ↗
  • JS v4513226cdae34746b4dedf0b4dfa099e178179… static.cloudflareinsights.com ↗
  • JS tracking.js www.elegantthemes.com ↗
  • JS onesignal.js www.elegantthemes.com ↗
  • JS tracking-delayed.js www.elegantthemes.com ↗

WordPress detection

WordPress detected
No
Signal strength
Theme
–
Builder
–
Generator meta
Not set
WP-JSON link
No

Redirect chain

301 → https://www.elegantthemes.com/

https://elegantthemes.com/

Optimisation potential3

Watch

These points are not critical, but can improve the performance, stability or clarity of the page structure.

Mehrere externe Dienste werden im Browser aktiv geladen

Beim echten Seitenaufbau wurden 7 externe Hosts kontaktiert.

Recommendation: Externe Skripte und Drittanbieter-Verbindungen reduzieren oder bündeln.

Viele CSS- und JavaScript-Dateien erkannt

Direkt im HTML wurden 3 CSS-Dateien und 20 externe JavaScript-Dateien erkannt.

Recommendation: Unnötige Assets reduzieren und Theme-/Plugin-Last prüfen.

Keine Resource Hints erkannt

Die Seite lädt von 3 externen Hosts, nutzt aber weder preconnect noch dns-prefetch.

Recommendation: Für die wichtigsten externen Hosts preconnect oder dns-prefetch im HTML-Head setzen.

Already done well5

Good

These points already stood out positively in the current scan.

Serverantwort ist schnell

Die Serverantwort liegt bei rund 53 ms.

Komprimierung ist aktiv

Erkannte Komprimierung: br.

HTTPS ist aktiv

Die Website ist per HTTPS erreichbar.

Show more positive points (2)

HTTP/2 ist aktiv

Die Website wird über HTTP/2 ausgeliefert.

IPv6 wird unterstützt

Die Website ist per IPv6 erreichbar.

Additional hints2

Note

Supplementary hints from the scan that can be useful for classification and technical assessment.

Zusätzliche CSS-Abhängigkeiten erkannt

In CSS wurden 3 weitere Stylesheet-Abhängigkeiten erkannt.

WordPress wurde nicht eindeutig erkannt

Im HTML und in den Asset-Pfaden wurden keine klaren WordPress-Hinweise gefunden.

Waterfall

Detailed request waterfall from the browser run.

Raw data

Complete scan data as a machine-readable JSON file or tabular export.

More export formats & API access

PDF, Excel, CSV and full API access are available on paid plans.

View plans →

Personalised AI recommendations

Scan your website and get an AI analysis with concrete measures – free with an account.

Register for free →
  • Unlimited analyses · Every scan, any time
  • Prioritised findings · What really matters
  • AI analysis · individual & automatic